Preventive maintenance

Scheduled inspection of protection, connections, batteries, inverters, monitoring and actual operating modes.

Stage deliverable

What you receive

A documented result can be checked, accepted and handed to the next specialist.

  1. 01Visual and thermal inspection
  2. 02Log and settings review
  3. 03Backup-mode test
  4. 04Service report and corrective plan
Quality rule

Unknown data does not silently become an assumption.

A missing measurement, document or access point is recorded as a risk with an owner and verification date.

Next step

Start with a preliminary system estimate.

Get an indicative configuration immediately. The engineering quotation is prepared after the site data has been verified.