Private home

Home backup power

Critical home circuits sized for pumps, boiler, gates and three-phase service.

Size this configuration
Who it is for

When this solution fits

  • Detached homes
  • Townhouses
  • Country houses
Scope of work
  • Energy profile and load priorities
  • Single- or three-phase architecture
  • Generator integration when required
  • Monitoring, training and system passport
Before the quotation

What we verify before selecting equipment

01

Pump starting currents

The input, risk and verification method are documented in the proposal and design.

02

Phase balancing

The input, risk and verification method are documented in the proposal and design.

03

Existing grounding

The input, risk and verification method are documented in the proposal and design.

Proposal format

Three options based on the same input data.

01

Sufficient

Covers the defined critical loads without future capacity.

03

Expandable

Allows compatible future batteries, PV or additional loads.

Example estimate

A typical scenario in numbers

Peak 5 kW · average 1.2 kW · backup 8 h

Use your own numbers
Inverter from6.5 kW
Recommended battery13 kWh
Minimum battery12 kWh
Critical energy9.6 kWh

A preliminary estimate using the calculator formula (90% DoD, 92% efficiency, 10% ageing reserve). Not a commercial offer.

Common questions

What Kyiv and Sumy customers ask

01Will the system handle pump, boiler and gate starting currents?

Pump starting currents are several times the nominal figure, so the inverter is sized for the peak, not the average. We measure or estimate the starts during the audit and record them in the specification.

02The house has a three-phase supply — what changes?

We choose between a three-phase architecture and dedicated critical single-phase groups. The decision depends on pumps, the boiler and phase balance; both options appear in the proposal with their trade-offs.

03Can an existing generator be integrated?

Yes. A generator can charge the battery and feed backup circuits through automatic transfer. The grid / battery / generator priority is configured and tested at commissioning.

Next step

Start with a preliminary system estimate.

Get an indicative configuration immediately. The engineering quotation is prepared after the site data has been verified.