Apartment

Apartment backup power

Internet, lighting, refrigerator, workspace and boiler — without unsafe improvisation.

Size this configuration
Who it is for

When this solution fits

  • Apartments
  • Home offices
  • Rental homes
Scope of work
  • Critical-load list and measurement
  • Inverter, LiFePO₄ battery and protection
  • Dedicated backup circuits and bypass
  • Testing outage and recovery modes
Before the quotation

What we verify before selecting equipment

01

Refrigerator starting current

The input, risk and verification method are documented in the proposal and design.

02

Space and ventilation

The input, risk and verification method are documented in the proposal and design.

03

Condition of the apartment panel

The input, risk and verification method are documented in the proposal and design.

Proposal format

Three options based on the same input data.

01

Sufficient

Covers the defined critical loads without future capacity.

03

Expandable

Allows compatible future batteries, PV or additional loads.

Example estimate

A typical scenario in numbers

Peak 2.5 kW · average 0.45 kW · backup 6 h

Use your own numbers
Inverter from3.5 kW
Recommended battery4 kWh
Minimum battery3.5 kWh
Critical energy2.7 kWh

A preliminary estimate using the calculator formula (90% DoD, 92% efficiency, 10% ageing reserve). Not a commercial offer.

Common questions

What Kyiv and Sumy customers ask

01Can backup power be installed in a Kyiv or Sumy apartment building?

Yes, provided the apartment panel is sound and there is ventilated space for the equipment. An inverter with a LiFePO₄ battery is quiet and emission-free, so it suits living spaces. We check refrigerator starting currents and wiring condition during the audit.

02How many hours will an apartment system run during an outage?

Autonomy is set by the average critical load and battery capacity, not the inverter rating. A worked example for a typical apartment is shown above; the final figure is confirmed from your appliance list.

03Does the condominium or building manager need to approve the system?

We work within the apartment panel without touching shared building networks. If the manager or condominium asks for documentation, we provide a single-line diagram and a scope description.

Next step

Start with a preliminary system estimate.

Get an indicative configuration immediately. The engineering quotation is prepared after the site data has been verified.