05

Prosumer support

Technical and document support for zero-export or surplus-energy sale.

Stage deliverable

What you receive

A documented result can be checked, accepted and handed to the next specialist.

  1. 01Connection-point review
  2. 02Metering diagram
  3. 03Document package
  4. 04First-settlement verification
Quality rule

Unknown data does not silently become an assumption.

A missing measurement, document or access point is recorded as a risk with an owner and verification date.

Next step

Start with a preliminary system estimate.

Get an indicative configuration immediately. The engineering quotation is prepared after the site data has been verified.