04
Monitoring and service
We verify operation after launch and maintain a service history.
Stage deliverable
What you receive
A documented result can be checked, accepted and handed to the next specialist.
- 0130/90-day review
- 02Support log
- 03Preventive maintenance
- 04Controlled expansion
Next step
Start with a preliminary system estimate.
Get an indicative configuration immediately. The engineering quotation is prepared after the site data has been verified.
